Imants BVBA
Consulting and Services |
Quick Changeover (SMED) |
|
|
|
SMED
stands for Single Minute Exchange of Die, and
covers the techniques for obtaining a changeover time of less than 10
minutes ( a single digit number of minutes).
The SMED method is introduced by Dr. Shigeo Shingo, one of the world's leading experts in improving manufacturing processes. Basically, the SMED methodology consists of 6 steps:
In the member area, you will have access to
You can have access to this content and all the other content on the Lean Manufacturing Coaching website (see the links below)
|
|
| Member Area Content |
Getting Started
Lean Manufacturing Concepts Lean Manufacturing Tools
Lean Office Lean Supply Chain
|
|
|